[1]
Doneva, N., Hadzi-Nikolova, M. and Mijaklovski, S. 2019. ANALYSIS OF REQUIRED CONSTRUCTION TIME FOR DRIFT IN ROCK TYPE – LEAD AND ZINK ORE. Natural Resources and Technology. 13, 13 (Oct. 2019), 5-9.