ANALYSIS OF REQUIRED CONSTRUCTION TIME FOR DRIFT IN ROCK TYPE – LEAD AND ZINK ORE

  • Nikolinka Doneva
  • Marija Hadzi-Nikolova
  • Stojance Mijaklovski

Abstract

This paper presents the analysis of the construction of drift, as a horizontal mining facility. The 9 variants drift construction, in rock type lead-zinc ore were formed. Assumed length of objects in all variants was 1000 m '. The aim of this research was to determine the required time for construction of all variants and then to reduce it to the time required for construction of 1 m` per facilities. Based on analysis, two parametric functional dependents of construction time are determined in relation of uniaxial rock mass compressive strength and the size of the facilities` cross section.

 

Downloads

Download data is not yet available.
Published
2019-10-22
How to Cite
Doneva, N., Hadzi-Nikolova, M., & Mijaklovski, S. (2019). ANALYSIS OF REQUIRED CONSTRUCTION TIME FOR DRIFT IN ROCK TYPE – LEAD AND ZINK ORE. Natural Resources and Technology, 13(13), 5-9. Retrieved from https://js.ugd.edu.mk/index.php/NRT/article/view/3065